Full home renovation — 2026

Full renovation · Completed in 2026

KB Home Reform completed a full renovation of this home in 2026. The work covered both essential services and interior finishes, with plumbing, electrical work, air conditioning, ceilings, tiling, bathroom renovation and a new kitchen coordinated as a single project.

Renovated living room with integrated kitchen, wood panelling and air conditioningBright, renovated living room with sliding doors to a balcony and a viewNew L-shaped kitchen with light cabinet fronts, a wood-coloured worktop and recessed lightingInstalled kitchen with integrated appliances, a black sink and wood wall panellingRenovated bathroom with shower screen, vanity unit, mirror lighting and washing machineFully tiled shower with a black glass screen, overhead shower and linear ceiling lightingRenovated bedroom with wood panelling, recessed ceiling lighting and balcony doors

What we did

  • Installation of new water pipes
  • Installation of new electrical wiring
  • Installation of air conditioning
  • Installation of plasterboard ceilings
  • Tiling
  • Bathroom renovation
  • Design and installation of a new kitchen

Technical details

Kitchen design and installation
The project included the design and installation of a new kitchen, with the layout developed as part of the overall home renovation.
Bathroom and interior finishes
The bathroom was renovated as part of the full renovation. Tiling and new plasterboard ceilings formed part of the work on the interior finishes.

Planning a home renovation in Gran Canaria?

Contact KB Home Reform to discuss your project.